Skip to content
  • start
  • adventure
    • food
    • drink
    • travel
  • knowledge
    • GGE6022
    • technology
    • programing
    • hydrography
  • and other ramblings
  • huh?

in the pursuit of

knowledge and adventure

Uncategorized November 24, 2016 by Weston

The New York Times

The New York Times

Legal disputes have delayed construction, but the pipeline is nearly complete.

cross-posted on Facebook

FacebookIFTTT

Post navigation

NPR Finds The Head Of A Covert Fake News Operation In The Suburbs
Standing Rock Sioux Tribe

about

My name is Weston Renoud.

I am a traveler, a singer, a poet, and a scientist. I drink scotch, smoke a tobacco pipe, and fold origami. I love to hike, bike, and swim in really cold water.

meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
© 2025 in the pursuit of – Black Theme by ZThemes Studio